Priya Shah is over capacity and holding up Harbor & Pine website rebuild and Copperline driver app redesign
Priya Shah is planned at up to 120% of capacity in the next 4 weeks. Assigned to 4 active projects (Harbor & Pine website rebuild, Copperline driver app redesign, Atlas digital retainer, Kestrel site support retainer). 1 task(s) blocked waiting on them. Affected: Harbor & Pine website rebuild: "Build complete" is blocked; Harbor & Pine website rebuild: "Launch" has slipped 63 days; Copperline driver app redesign: "Beta build" is blocked.
Why it matters: One person is on the critical path for 2 projects; until their load is rebalanced those milestones keep slipping and their billing waits.
- Owner
- Grace Kim
- Next update
- Oct 9, 2026 · in 4 days
- Peak planned load
- 120%